Resume Of Industrial Projects

Brickworks in Gloucestershire

  • A second-hand dryer was supplied to dry soft mud clay bricks in 24 hours, previously the bricks took 5 days to dry. The installation of this dryer reduced the customer’s gas consumption by 50% and the payback time was 12 months.
  • The above dryer was subsequently extended to double the capacity and made into 2 zone control.
  • Re-commissioning of gas kiln. After the work had been completed the temperature uniformity was improved which allowed the customer to reduce the firing cycle and gave better quality production.
  • Pressure control dampers installed on an updraught gas kiln. After the installation the gas consumption was reduced by 15%.

Roof and Cladding Tile Manufacturer in Bangladesh

  • Two gas firing intermittent kilns exported from the USA refurbished and commissioned by Jariston.

Foundry in North Devon

  • A new fibre lining and improved control system was installed on a rotary furnace which allowed better control of organics burnt out of moulds.

Sanitaryware factory in County Durham

  • Complete dismantling and relocation of factory equipment.

Sanitaryware factory in Stoke-on-Trent

  • The hydraulic kiln car pusher system was replaced on two tunnel kilns. The new system is PLC controlled with linear encoders. The pushing time accuracy now is ± 2 seconds.

Earthenware factory in Stoke-on-Trent

  • The automation system on a tunnel kiln was upgraded so it would operate faster, thus increasing production volume.

Sanitaryware factory in Yorkshire

  • New stainless steel exhaust stacks installed on 2 intermittent kilns.
  • Upgraded control system on ware dryers and casting shop heating system.
  • Relocation of gas-fired intermittent kiln.

Tableware factory in Staffordshire

  • Installation of a new fibre lining, brickwork and heating elements to a moving hood electric kiln.

Commissioning

  • New and old intermittent and tunnel kilns, curing ovens, afterburners and dryers commissioned or re-commissioned at many different factories throughout the world.

SCADA Systems

  • Supervisiory Control and Data Acquisition systems installed and maintained on various types of heat process equipment.