Resume Of Industrial Projects
Brickworks in Gloucestershire
- A second-hand dryer was supplied to dry soft mud clay bricks in 24 hours,
previously the bricks took 5 days to dry. The installation of this dryer reduced
the customer’s gas consumption by 50% and the payback time was 12 months.
- The above dryer was subsequently extended to double the capacity and made
into 2 zone control.
- Re-commissioning of gas kiln. After the work had been completed the temperature
uniformity was improved which allowed the customer to reduce the firing cycle and gave
better quality production.
- Pressure control dampers installed on an updraught gas kiln. After the
installation the gas consumption was reduced by 15%.
Roof and Cladding Tile Manufacturer in Bangladesh
- Two gas firing intermittent kilns exported from the USA refurbished and commissioned by Jariston.
Foundry in North Devon
- A new fibre lining and improved control system was installed on a rotary furnace
which allowed better control of organics burnt out of moulds.
Sanitaryware factory in County Durham
- Complete dismantling and relocation of factory equipment.
Sanitaryware factory in Stoke-on-Trent
- The hydraulic kiln car pusher system was replaced on two tunnel kilns.
The new system is PLC controlled with linear encoders. The pushing time accuracy now is ± 2 seconds.
Earthenware factory in Stoke-on-Trent
- The automation system on a tunnel kiln was upgraded so it would operate faster,
thus increasing production volume.
Sanitaryware factory in Yorkshire
- New stainless steel exhaust stacks installed on 2 intermittent kilns.
- Upgraded control system on ware dryers and casting shop heating system.
- Relocation of gas-fired intermittent kiln.
Tableware factory in Staffordshire
- Installation of a new fibre lining, brickwork and heating elements to a moving hood electric kiln.
Commissioning
- New and old intermittent and tunnel kilns, curing ovens, afterburners and
dryers commissioned or re-commissioned at many different factories throughout the world.
SCADA Systems
- Supervisiory Control and Data Acquisition systems installed and maintained on
various types of heat process equipment.
|